Hi Manis and Uswin,
Let me give you this picture and perhaps it is clearer on my question below...
Designing method:
A - design above flow of the green color receiving area as interim storage type (i.e. standard SAP 902 interim) or
B - design above green color receiving area as one GR area storage type (i.e. non interim)?
Questions:
- If I choose A desgin, when I perform GR, the goods will stay in 902, next when I perform confirmation of the TO, the goods will go to the final storage type (i.e. final bin picture), correct?
- If I choose B design, when I perform GR, the goods will stay in 902, next when I perform TO confirmation, the goods will go to the green inbound receiving area. Finally, if I want to move to the final bin storage, I have to create another transfer order and move to the final storage?
- Which design is better given the goods will stay in the green area for 1 to 2 hours?
Rgards,
Tuff