Hi All,
We would like to copy our production SAP BW sytem (BWP) to the quality SAP BW system (BWQ),witout renaming the ECC production logical system name (LSN), i.e : without executing the BDLS process to rename the BWQ Logical System source name.
Then the futur ECC source system logical name for SAP BWQ will be ECP100 (Prod ECC) and not ECQ100 (quality ECC). In other words, the BWD will be connected to ECC quality system (ECQ) but this ECC quality system will named ECP.
Our questions:
- Could we do the SAP BW system copy without BDLS process (keeping the ECC prod system source logical system name)?
- Knowing that the DTP and transformations IDs are different between BW quality and prod system (RSBKDTP conversion after transport), do you know how the system will react when we will transport later (after the system copy) a DTP (or transformation) from BWQ to BWP ?
PS:
- SAP version : 7.3
- We would like to keep the production ECC source system logical name for the SAP BW quality system, because we had a several problems with BDLS in the past.
Quickly help will be very appreciated.
Ricky.