HI, Renuga.
Actually at the time of subcontracting migo, all the component were consumed with standard wastage 10% but we don't' want to consume that all material with wastage we will put these on manually and we can not clear the scrap 10% from material master mrp4, so please give the answer with consider of this case scenario, or other alternative solution because there are hundred of components which are being consume .
thanks
Regard
Anurag Bhatt